Traunsee Escape ​

Internal planning and research for Traunsee Escape, an escape-room venue planned in Gschwandt near Gmunden.

Project identity ​

UseSelected identity
Company nameRenner Interaktiv GmbH
Customer-facing venue brandTraunsee Escape
Search listingTraunsee Escape - Escape Rooms bei Gmunden
TaglineZwischen Berg und See beginnt euer Abenteuer.

Canonical public identity: Traunsee Escape - Escape Rooms bei Gmunden: Zwischen Berg und See beginnt euer Abenteuer.

This records the naming decision made on 19 August 2026. It does not by itself confirm company registration, trademark clearance, domain ownership or social-handle availability.

HIGH NEXT PRIORITIES ​

  1. Prepare the BH submission: Use the attached official BH protocol Ge20-3865 to assemble the operating description, detailed construction/escape-route plans, land-use/cadastral/open-space/site plans, heating and ventilation projects, accessibility design, employee information and waste concept. Confirm Renner Interaktiv GmbH as the applicant/operator, the current forms, procedural route and final copy requirement before filing for a maximum of 50 people.
  2. Freeze the approval layout: Reconcile the protocol/listing/plan areas of 325/375/355.25 m², then plan the complete hall immediately for five escape rooms plus the children’s room, while finishing and opening only two escape rooms at launch. Show every room, wall, door, emergency opening, escape-route length, corridor width, accessible WC and maximum people per room.
  3. Close the fire and egress points: Herr Gillesberger checks the fire-separating construction below the hall and the currently non-fire-separating wall to the neighbouring hall. The hall exit door likely needs replacement so that it opens in the escape direction and has the required panic hardware.
  4. Commission the technical projects: An electrical contractor must design the required general and emergency/escape-route lighting. An installer must calculate room-by-room air requirements and prepare the ventilation project; dB data, data sheets and positions for ventilation and heat-pump equipment must be submitted to the BH.
  5. Protect budget and lease: Price the expanded customer and staff sanitary facilities, fire/safety work, building services and complete shell fit-out before relying on the existing financial model. Confirm Hall 2 boundaries, ancillary rooms, parking, approval condition and reinstatement obligations in writing.
AreaCurrent focus
VenueSelected Gillesberger unit, lease and approvals
FinancialsSite costs, investment model and operator benchmarks
OperationsCapacity, toilets, approvals, guest flow and safety
HVAC planRequired ventilation project, equipment data and positions
StaffLaunch roles and coverage
RoomsFive-room end layout, children’s room and two-room opening scope
Room Tech LabVisual ESP32, RFID, CAN, power and output build reference
BrandSelected company name, venue brand, search listing and tagline
CompetitorsNearby operators and Austrian market records