Skip to content

Operations

Back to the repository overview

Capacity and schedule

ProductCapacitySession
Flagship4–8 playersAbout 90 minutes
Smaller room A2–6 playersAbout 60 minutes
Smaller room B2–6 playersAbout 60 minutes
Full venue waveUp to 20 playersStaggered starts
  • Advance reservations are offered at any time, including outside ordinary leisure hours. The venue is not continuously staffed and has no walk-in hours.
  • Founders cover bookings outside the approximately 20-hour employee schedule.
  • One human operator should normally monitor all three rooms. Starts are staggered and resets target 10–15 minutes.
  • Target opening is within nine months of lease commencement.

Guest flow

  • Corporate groups are a core launch segment. Reception, briefing and waiting should accommodate about 20 people in approximately 35–40 m², with simple drinks but no dedicated event room.
  • The existing separated room holds workshop, storage, control and technical equipment. The existing restroom is retained.
  • At least one smaller room should be usable without crawling or climbing.
  • The unused hall area remains separated, unconditioned and outside the normal guest route.

Occupancy and toilets

The current setup has two toilets. The preliminary upper-floor plan shows them as two small cubicles in a 14.50 m² wet area with one basin; each cubicle door is drawn as 70 cm wide. The drawing does not show an accessible WC.

Twenty players remains a planning capacity, not an approved occupancy. The two toilets may be operationally workable with staggered starts, but the municipality/BH must confirm whether the current arrangement is sufficient for 20 guests plus an operator, whether one WC must be reserved for staff, and what accessible/customer facilities are required.

Approvals, safety, cameras and the toilet decision

Safety and building services

  • Human game-master supervision, cameras, communication and emergency unlocking are required at launch. AI support may be added later but is not a safety control.
  • Fog/smoke, lasers, motorized props, batteries, chargers and other effects.
  • Music, vibration and external noise.
  • Heating, cooling and fresh air should serve the three game rooms and reception/waiting area, not the whole 375 m² hall. The system remains unquoted and must be sized for actual occupancy and heat loads.
  • Elevated and crawl areas require a safe alternative in the accessible room and professional review where structural or approval-relevant.

No municipality or BH Gmunden approval discussion has happened yet. The room layout, occupancy, fire plan, HVAC, staffing model and financial forecast must be reconciled after those calls.